The campus of San Antonio’s first public secondary college, recognized at present as Fox Tech Excessive Faculty, is about to bear main adjustments.
The Historic and Design Evaluation Fee not too long ago gave conceptual approval for the $81 million venture accepted final summer season by the San Antonio Impartial Faculty District and supported by the district’s 2020 bond program.
The venture features a new performing arts constructing with a 704-seat auditorium, a black field theater, athletics constructing and a floor car parking zone.
The college’s historical past begins in 1879, with the primary college campus constructed on the positioning in 1882, based on the Texas Historic Fee. San Antonio Excessive Faculty grew to become Important Avenue Excessive Faculty in 1917, then San Antonio Vocational and Tech Excessive Faculty in 1932.
The identify was modified once more in 1961 to Fox Tech in honor of a principal who championed vocational schooling. Immediately, the campus additionally homes the Facilities for Utilized Science and Know-how (CAST), opened in 2017, and a legislation magnet college.
Final yr, the varsity was caught up in a city- and county-backed plan to construct a brand new $160 million Missions baseball stadium adjoining to the varsity.
Holding the keys to a key piece of property wanted for the venture, San Antonio ISD trustees met the proposal with calls for of their very own, securing guarantees of inexpensive housing items, a parking storage and land for a brand new Superior Studying Academy campus in trade for a tentative settlement to promote the lot.
On Wednesday, the design assessment panel agreed to grant a certificates of appropriateness for the varsity’s theater and health club venture, which is about to start building this yr.
Paperwork submitted to the panel state that the performing arts middle might be constructed on the northeast nook of the campus, on the nook of West Quincy Avenue and Jackson Avenue. The present north car parking zone might be demolished.
The design options steel facade panels, glazed brick, glass curtain wall programs and glazed tile.
The deliberate black field theater constructing might be located to the south of the performing arts middle. It is going to function steel facade panels and a ribbed concrete masonry veneer.
The athletics constructing is deliberate for a central house on the campus and can join two current gyms. The brand new addition will home new code-compliant locker rooms, dressing rooms and showers, and different supporting areas for the gyms.

The work is being carried out by Bartlett Cocke normal contractors and San Antonio-based structure agency Alta Architects.
A brand new 85-space car parking zone can be deliberate on the southeast finish of the campus the place the varsity’s day care and well being care buildings have been situated. That Nineteen Seventies-era construction was accepted for demolition in late 2024.
Lately, the campus has had restricted parking obtainable. In 2019, the district partnered with Bexar County to spend $17.2 million on a 600-space parking storage close to San Pedro Creek and Fox Tech, offering house for workers within the district’s new central workplace headquarters.
The storage was accomplished in 2021. Two years later, the varsity’s academics have been briefly relegated to a dusty, gravel lot earlier than the county and college district got here to an settlement over use of the storage.
Each Fox Tech and CAST Tech college students can have use of the brand new services, based on the planning paperwork. Every college has an enrollment of about 500 college students in grades 9-12.